Skip to content
Florida Certified Roofing Contractor CCC1330967 Licensed & insured Serving Palm Beach & Broward Counties Call only, no text: 561-409-3280
Aastro Roofing CompanyFour generations of roofing tradition
Illustrative collage of residential and commercial roof systems for Aastro Roofing Company's roof replacement guide
Aastro Roofing Company round badgeAastro Roofing CompanyFamily-owned · Four generations of roofing experience represented in the office
Residential · Commercial · Multifamily · Associations

Roof Replacement in Palm Beach and Broward Counties

Compare residential and commercial replacement by roof system, assembly, repair history, insurance considerations, energy goals, financing, warranty eligibility, property operations, and long-term value—before choosing the scope.

Call 561-409-3280
Free inspections and estimatesInstant residential estimate pathwayCommercial consultation pathwayQualifying 25-year workmanship warranty
FLCCC1330967Florida Certified Roofing Contractor
25Qualifying replacements25-year workmanship warranty
$Qualified borrowersPromotional and extended-term financing
MFGSystem-specificCredential and warranty pathways
Verify Credentials
Replacement authority contract

Replacement is a five-stage assembly decision—not a material swap.

The correct path starts by confirming whether replacement is actually justified, then classifies the property and roof system, defines every layer of the proposed assembly, validates wind/code/warranty/budget constraints, and closes the project with inspections and documentation.

1 · Confirm the decision

Recurring leaks, repeated repairs, widespread deterioration, insurance pressure, renovation goals, storm conditions and lifecycle cost can justify a replacement review—but one isolated defect may still belong in repair.

Compare repair first
2 · Classify the property

Single-family homes, commercial buildings, associations and portfolios require different estimating, access, approval, phasing and communication paths.

Residential authority
3 · Define the assembly

Deck, moisture, secondary water resistance, insulation, attachment, covering or membrane, flashing, drainage, ventilation and transitions must be specified as one system.

Compare roof systems
4 · Validate constraints

Current project documents, wind pressures, product approvals, manufacturer requirements, permits, financing and written warranty eligibility control the final specification.

Wind & code authority
5 · Execute and close out

Tear-off findings, field changes, inspections, photographs, closeout records and warranty documents should create a traceable record of the installed roof—not just a completed surface.

Verify contractor authority
Authority handoffs

Move from the replacement question into the correct specialist page.

The hub owns the overall replacement decision. The child authorities own the system-specific, property-specific and wind/code details.

Single-family

Residential Replacement

Route homeowners into tile, shingle, metal, flat and specialty replacement planning, field verification, financing and system selection.

Open Residential Replacement
Commercial / HOA / multifamily

Commercial Replacement

Coordinate roof areas, moisture, operations, equipment, access, phasing, procurement, warranties and capital planning.

Open Commercial Replacement
Assembly selection

Roof Systems

Compare sloped, low-slope, tile, shingle, metal, membrane and specialty system families before locking the project scope.

Open Roof Systems
Florida performance

Wind, Code & Mitigation

Connect roof-zone pressures, deck attachment, secondary water resistance, roof-to-wall connections and product approvals to the replacement design.

Open Wind & Code
Direct Answer

What is a roof replacement?

A roof replacement removes or properly incorporates the existing roof as allowed by the approved scope, evaluates the supporting substrate, and installs a complete permitted roof assembly—not merely a new visible surface. The assembly may include deck correction, secondary water resistance or underlayment, insulation, attachment, roof covering or membrane, flashings, penetrations, drainage, ventilation, edge conditions, inspections, documentation, and warranty records.

Replacement is not automatically the right decision. The roof’s physical condition, repairability, remaining service potential, property plans, insurance considerations, approved assemblies, and total cost should be compared first.

Choose the Correct Conversion Path

Residential and Commercial Replacement Require Different Decisions

The property type changes the estimate method, roof-system choices, approval chain, scheduling, safety plan, documentation, financing, warranty pathway, and project coordination.

Illustrative South Florida commercial building with a low-slope roof for commercial replacement planning
Commercial · Multifamily · Associations

Plan the Roof Around the Property and Operations.

Evaluate TPO, PVC, KEE, modified bitumen, built-up roofing, metal, coatings or restoration alternatives, moisture, drainage, rooftop equipment, phasing, occupied spaces, warranty goals, and capital planning.

Replacement Evaluation Signals

Eight Conditions That Can Change the Repair-versus-Replacement Decision

No single item proves that replacement is required. The combination determines whether another repair creates useful value or simply delays a broader project.

1

Recurring Leaks

Different leak locations or repeated service can indicate broader assembly deterioration.

2

Repeated Repairs

Repair history matters more than one isolated invoice because the roof continues to age between visits.

3

Widespread Damage

Storm, traffic, corrosion, brittleness, moisture, or attachment problems may extend beyond one repairable area.

4

Material Workability

Surrounding tile, shingles, panels, membrane, flashings, or substrate may no longer support a controlled tie-in.

5

Concealed Moisture

Wet insulation, damaged decking, or trapped water can make surface-only repair incomplete.

6

Insurance Pressure

Carrier inspections, underwriting, or mitigation documentation may affect timing without determining the roofing scope.

7

Property Planning

Sale, renovation, solar, tenant work, capital planning, or a long ownership horizon can change the best timing.

8

Total Cost

Repair, emergency service, disruption, inflation, energy, maintenance, and eventual replacement should be compared together.

Compare the Available Strategies

Repair, Restore, Recover, or Replace?

These terms are not interchangeable. The existing assembly, moisture, code, manufacturer requirements, structural conditions, attachment, slope, drainage, and project objectives control which strategies remain available.

StrategyTypical UseWhat It Does Not Automatically SolvePrimary Decision Test
Localized repairDefined defect with workable surrounding materials and a controllable moisture boundary.Unrelated aging, distant defects, widespread moisture, or the balance of the roof.Can the defect be isolated and tied into compatible materials?
MaintenancePreventive cleaning, drainage, sealant, detail correction, documentation, and controlled minor work.A failed assembly, saturated insulation, unsuitable substrate, or widespread deterioration.Is the roof fundamentally serviceable and maintainable?
Restoration or coatingEligible low-slope roof with suitable adhesion, dryness, drainage, details, and manufacturer-approved preparation.Wet insulation, structural problems, incompatible materials, poor drainage, or every insurance concern.Does testing and the approved system establish a viable restoration candidate?
RecoverNew assembly installed over an eligible existing roof when code, moisture, attachment, substrate, and manufacturer requirements allow.Unknown concealed conditions or ineligible existing layers.Has the existing roof been proven dry, secure, compatible, and legally recoverable?
Full replacementRemoval and reconstruction of the complete roof assembly or defined roof area.Unrelated building-envelope, HVAC, plumbing, condensation, or structural issues outside the roofing scope.Does complete replacement provide the clearest technical and financial path?
Roof-System Directory

Replacement Options by Roof Type

Every system needs a page that explains its materials, attachment, approved assemblies, maintenance profile, energy characteristics, warranty pathway, and limitations.

SH

Asphalt Shingles

Architectural, premium, designer, ventilation, flashing, deck, and enhanced-system options.

CertainTeed prioritized; additional verified manufacturers lower in the hierarchy.
TI

Concrete and Clay Tile

Profiles, colors, underlayment, foam or mechanical attachment, flashings, valleys, and loading.

Westlake Newpoint, US Tile, components, and other verified tile families.
MT

Metal Roofing

Standing seam, 5V, exposed fastener, specialty panels, finishes, coastal exposure, and transitions.

Panel, clip, fastener, substrate, finish, and approved assembly must be coordinated.
FL

Residential Flat Roofs

TPO, PVC, KEE, modified bitumen, built-up, drainage, insulation, and parapet details.

System selection depends on slope, use, drainage, traffic, and compatible tie-ins.
SP

Composite and Specialty

Composite slate or shake, stone-coated steel, cedar, and specialty architectural systems.

Availability, approvals, fastening, wind design, fire classification, and maintenance vary.
TP

TPO

Commercial single-ply assemblies with insulation, cover board, attachment, welding, drainage, and details.

Membrane brand alone does not define the complete warranted assembly.
PV

PVC and KEE

Heat-welded commercial systems for properties requiring system-specific chemical, grease, or performance review.

SOPREMA and FiberTite pathways are contextual and project-specific.
MB

Modified Bitumen and BUR

SBS, APP, self-adhered, cold-applied, hot-applied, multi-ply, surfacing, flashing, and drainage options.

CertainTeed commercial and SOPREMA relationships receive featured review.
Illustrative South Florida residence with a standing-seam metal roof for roof-system planning
The Complete Assembly

A Roof Replacement Should Define More Than the Finish Material

The proposal should make each layer and responsibility understandable before work begins.

1

Existing Roof and Removal Plan

Layers, tear-off limits, disposal, protection, recover eligibility, and hazardous or unusual materials.

2

Deck, Substrate, and Concealed Conditions

Wood, concrete, lightweight concrete, metal deck, gypsum, corrosion, deterioration, unit pricing, and authorization.

3

Water, Air, and Thermal Control

Secondary water resistance, underlayment, vapor control, insulation, cover board, ventilation, and building-science coordination.

4

Attachment and Wind Design

Fasteners, adhesive, foam, clips, spacing, zones, perimeter and corner requirements, tested assemblies, and substrate capacity.

5

Roof Covering, Membrane, and Details

Field materials, flashings, penetrations, walls, curbs, edges, valleys, transitions, drainage, accessories, and compatible components.

6

Permits, Inspections, Documentation, and Warranties

Approved documents, inspection sequence, field photography, closeout records, manufacturer requirements, and written workmanship coverage.

Verified Aastro replacement evidence

Replacement decisions become clearer when the concealed work is visible.

These verified Aastro field images show tear-off, concealed deck conditions and completed residential roofing. They are project evidence—not generic product renderings.

Aastro Roofing crew tearing off an existing roof in Coconut Creek
Tear-Off · Coconut CreekExisting materials must be removed or incorporated only as the approved scope allows before the supporting assembly can be fully evaluated.
Aastro Roofing replacing roof deck wood during a tile roof replacement in Boynton Beach
Concealed Deck Conditions · Boynton BeachTear-off can expose deterioration, attachment conditions and other work that should be documented before the new assembly covers it.
Completed Aastro tile roof in Boca Isles
Completed Residential Roof · Boca RatonThe finished covering is the visible result; performance also depends on the assembly installed beneath and around it.
Potential Replacement Benefits

A New Roof Can Create More Value Than Stopping One Leak

Benefits depend on the selected assembly and property. They should be modeled, documented, and qualified—not guaranteed.

Risk and Reliability

Reduce Recurring Failure Points

Replacement can address aging field materials, flashings, underlayment, attachment, edges, and transitions together.

Insurance Documentation

Create a New Permitted Record

A permitted roof and verified mitigation features may support underwriting review, but the insurer controls eligibility and pricing.

Energy and Comfort

Evaluate Reflectivity and Thermal Control

Cool-roof products, insulation, ventilation, and air-sealing opportunities may improve performance in hot climates when properly designed.

Capital Planning

Convert Emergency Spending Into a Defined Project

Owners and boards can compare scope, alternates, phasing, financing, reserves, disruption, and maintenance before mobilization.

Manufacturer Pathways

Build the Specified System

Credential and warranty eligibility depend on the applicable manufacturer, assembly, project registration, inspections, and written requirements.

Property Presentation

Coordinate Architecture and Long-Term Appearance

Profile, color, finish, drainage, edge metal, rooftop equipment, and visible details can be planned as one project.

Approved Financing and Warranty Language
0% up to 18 months

Promotional financing may be available to qualified borrowers. Qualified terms may extend to 20 years.

Compare the Roof, the Payment Structure, and the Cost of Waiting.

Promotional Plans0% interest for up to 18 months may be available to qualified borrowers.
Extended TermsQualified financing terms may extend to 20 years.
Qualifying Warranty25-year workmanship warranty on qualifying new roof replacements.
Written ControlsThe lender documents, signed contract, and written warranty control all terms.

Financing is subject to lender approval, current terms, eligibility, availability, and required disclosures. Aastro does not make lending decisions or guarantee approval. The signed contract and written warranty control coverage, exclusions, transferability, maintenance, and service procedures.

Open Roof Financing Guide
Seven-Question Replacement Planner

What is the most appropriate next step for your property?

This planning tool routes the visitor into residential instant estimate, inspection-first, commercial consultation, association capital planning, urgent water response, storm documentation, system comparison, or repair-versus-replacement review. It does not diagnose the roof or create a contract price.

1. What type of property is this?Property type controls the estimate and approval pathway.
2. What roof system is involved?Use “multiple” for campuses or combined steep- and low-slope roofs.
3. Is water entering the property now?Active water receives a phone-first pathway.
4. What is driving the replacement question?Select the condition that best reflects the current concern.
5. How much property is involved?This helps separate one-home estimates from portfolio or campus planning.
6. What is the primary goal?The goal affects the comparison and next action.
7. What is the planning timeline?The tool does not guarantee scheduling or response time.
The planner provides a starting direction; field verification and a written proposal control the final scope and price.
Aastro Replacement Process

From Initial Planning to Closeout

The sequence varies by system, property, permit, inspections, access, weather, material availability, and concealed conditions.

1

Route and Intake

Confirm property type, roof systems, county, urgency, decision authority, and project objective.

2

Inspection and Records

Document visible conditions, measurements, access, drainage, equipment, repair history, and available plans.

3

Assembly Development

Compare approved systems, substrate, attachment, thermal control, details, alternates, and warranty pathways.

4

Written Proposal

Define scope, exclusions, unit prices, allowances, schedule assumptions, protection, cleanup, and payment terms.

5

Permit and Procurement

Submit required documents, confirm selections, order materials, coordinate equipment, access, and stakeholder notices.

6

Production and Inspections

Protect the property, execute the approved sequence, document conditions, and complete required inspections.

7

Closeout

Complete punch items, cleanup, final records, warranty documents, photographs, and customer orientation.

8

Long-Term Service

Coordinate maintenance, storm review, rooftop trade activity, warranty requirements, and future documentation.

Standard Service-Area Pathways

Palm Beach and Broward Counties

Standard coverage excludes Pahokee and Belle Glade. Properties outside the listed area require manual service review. County booking links are intended for residential inspection; commercial, multifamily, and association projects should use the consultation pathway.

Palm Beach County

Residential replacement inspection and commercial consultation pathways.

AtlantisBoca RatonBoynton BeachBriny BreezesCloud LakeDelray BeachGlen RidgeGolfGreenacresGulf StreamHaverhillHighland BeachHypoluxoJuno BeachJupiterJupiter Inlet ColonyLake Clarke ShoresLake ParkLake Worth BeachLantanaLoxahatchee GrovesManalapanMangonia ParkNorth Palm BeachOcean RidgePalm BeachPalm Beach GardensPalm Beach ShoresPalm SpringsRiviera BeachRoyal Palm BeachSouth Palm BeachTequestaWellingtonWest Palm BeachWestlake
Book Palm Beach Inspection

Broward County

Residential replacement inspection and commercial consultation pathways, including HVHZ-aware assembly review.

Coconut CreekCooper CityCoral SpringsDania BeachDavieDeerfield BeachFort LauderdaleHallandale BeachHillsboro BeachHollywoodLauderdale-by-the-SeaLauderdale LakesLauderhillLazy LakeLighthouse PointMargateMiramarNorth LauderdaleOakland ParkParklandPembroke ParkPembroke PinesPlantationPompano BeachSea Ranch LakesSouthwest RanchesSunriseTamaracWest ParkWestonWilton Manors
Book Broward Inspection
Aastro Roofing Company round badge
Credentials Must Match the System

Verify the License, Insurance, Manufacturer Relationship, and Warranty Pathway

CertainTeed receives the lead manufacturer position for Aastro. Westlake product families are emphasized for tile systems. SOPREMA and FiberTite relationships are emphasized on applicable commercial systems. Other verified manufacturer credentials are presented lower in the hierarchy when they match the project.

Florida LicenseCCC1330967
Insurance EvidenceCurrent certificates available upon appropriate request
Manufacturer CredentialsExact title and current status controlled centrally
Warranty EligibilityAssembly, registration, inspections, and written terms control
Open Certifications and Licensing

Project gate: verify the project—not just the website.

Before proposal and permitting, Aastro should reconfirm the exact property, roof geometry, deck, moisture, design pressures, roof zones, current approvals or NOAs where applicable, manufacturer instructions, permit requirements, inspection sequence, warranty documents, financing terms and any insurance documentation requested by the owner or carrier.

  • Field conditions and the approved written scope control.
  • Insurance eligibility, discounts, premiums and claim outcomes remain carrier/policy decisions.
  • Financing remains subject to lender approval and current written terms.
  • Concealed conditions discovered during tear-off require documented authorization under the contract.
Direct-Answer Roof Replacement FAQs

Questions Property Owners Ask Before Replacing a Roof

These answers establish planning boundaries. The field evaluation, approved assembly, proposal, signed contract, permit documents, and written warranties control the project.

How do I know whether I need roof replacement instead of another repair?

Replacement should be evaluated when the roof has recurring leaks, widespread deterioration, repeated repair history, limited material workability, concealed moisture, underwriting concerns, or a remaining service period that does not justify another repair. Age alone does not decide the answer; the complete assembly and property objective must be evaluated.

Does a new roof automatically lower my insurance premium?

No. A new roof may improve insurability or help document qualifying wind-resistive features, but the carrier, policy, inspection, roof geometry, deck attachment, secondary water resistance, opening protection, and other features control the final underwriting or premium result. Aastro does not determine coverage or guarantee savings.

Can roof replacement improve energy performance?

It can. Replacement creates an opportunity to compare solar reflectance, thermal emittance, insulation, ventilation, air leakage, deck conditions, and rooftop equipment details. Actual energy performance depends on the complete building and roof assembly, not the roof covering alone.

What is included in a complete roof replacement proposal?

A complete proposal should identify removal or recover assumptions, deck and substrate procedures, approved underlayment or insulation, attachment method, roof covering or membrane, flashings, penetrations, drainage, ventilation, permits, inspections, protection, cleanup, warranty terms, exclusions, and the concealed-condition process.

Can I receive an instant roof replacement estimate?

Aastro offers an instant residential roof-replacement estimate pathway for qualifying single-family tile, shingle, and metal roofs. The online result is a planning tool, not a final contract price. Final scope and pricing depend on field verification, measurements, access, code requirements, selected system, and concealed conditions.

How are commercial roof replacements evaluated?

Commercial replacement begins with the property, occupancy, roof areas, existing assembly, moisture, drainage, equipment, access, operations, warranty history, phasing, and decision authority. Commercial and multifamily projects use a consultation and documented investigation rather than the residential instant-estimate tool.

Can a roof replacement be phased?

Sometimes. Phasing may be practical for portfolios, multifamily communities, large campuses, or clearly separated roof areas. The design must account for tie-ins, drainage, temporary conditions, warranties, budgeting, tenant operations, and the risk that delayed areas continue to deteriorate.

What financing options does Aastro offer?

Multiple financing options may be available to qualified borrowers. Promotional 0% interest for up to 18 months may be available, and qualified terms may extend to 20 years. Financing is subject to lender approval, current terms, eligibility, availability, and required disclosures. Aastro does not make lending decisions or guarantee approval.

What workmanship warranty is available?

Aastro offers a 25-year workmanship warranty on qualifying new roof replacements. The signed contract and written warranty control eligibility, covered workmanship, exclusions, transferability, maintenance, notification, and service procedures. A workmanship warranty is not a guarantee of roof lifespan.

Will the replacement expose damaged wood or wet insulation?

Removal may reveal deck deterioration, corrosion, wet insulation, trapped moisture, damaged lightweight concrete, or other concealed conditions that cannot be quantified from the surface. The proposal should define unit pricing, allowances, documentation, and authorization procedures for concealed work.

Which roof system is best for my property?

There is no universal best roof. The correct system depends on slope, structure, wind design, drainage, coastal exposure, architecture, energy goals, traffic, rooftop equipment, fire classification, maintenance capacity, budget, warranty objectives, and approved assemblies.

Which areas does Aastro serve for roof replacement?

Aastro provides standard residential and commercial replacement pathways throughout Palm Beach and Broward Counties, excluding Pahokee and Belle Glade from standard coverage. Properties outside the standard area require manual service review.

Primary-source guidance used for this page: Florida hurricane-mitigation guidance confirms that roof covering, deck attachment, secondary water resistance, roof geometry, and other verified features may affect available discounts; the insurer controls the result. U.S. Department of Energy guidance explains that cool-roof value depends on climate, reflectance, emittance, insulation, and the building. Florida mitigation guidance · DOE cool-roof guidance
Why can two roof-replacement proposals using the same manufacturer still be different?

The manufacturer name does not define the complete roof. Product line, underlayment or insulation, fasteners or adhesives, attachment pattern, flashing, starter and accessories, membrane thickness, cover board, ventilation, drainage, warranty path and installation method can all differ. Compare the complete specified assembly and written scope.

How do wind pressures and product approvals affect a Florida roof replacement?

The final assembly must be matched to the actual property and current project requirements. Roof geometry, height, exposure, roof zones, substrate, fastener or adhesive resistance, attachment spacing, edge conditions, tested assemblies, applicable product approvals or NOAs, and engineering where required can change both the scope and cost. A generic fastening schedule should not be assumed.

Start With the Correct Path

Compare the Roof System, Scope, Timing, Financing, and Long-Term Value.

Single-family homeowners can begin with an instant estimate or county inspection. Commercial, multifamily, condominium, HOA, and managed-property customers should begin with a documented consultation.