Skip to content
Florida Certified Roofing Contractor CCC1330967 Licensed & insured Serving Palm Beach & Broward Counties Call only, no text: 561-409-3280
Aastro Roofing CompanyFour generations of roofing tradition
Verified Aastro commercial roof replacement field work in West Palm Beach
Aastro Roofing Company round badgeAastro Roofing CompanyCommercial, multifamily, condominium, HOA, retail, office, warehouse, industrial, hospitality and institutional roofing
Commercial · Multifamily · Associations · Industrial

Commercial Roof Replacement Planned Around the Building—not Just the Membrane

Aastro Roofing evaluates the existing assembly, moisture, deck, insulation, drainage, rooftop equipment, building operations, phasing, wind design, manufacturer pathways and long-term capital goals before defining the replacement scope.

Call 561-409-3280
Low-slope and steep-slope systemsMoisture and drainage investigationOccupied-building coordinationManufacturer warranty pathways
Commercial replacement authority contract

Commercial replacement starts with the building, existing assembly, moisture, deck, drainage and operations—then selects the roof system.

The parent replacement authority owns the lifecycle decision and project controls. System-specific child pages own membrane, metal, tile and shingle design once the building investigation establishes the correct branch.

1 · Investigate the building

Inventory roof areas, occupancy, leak history, rooftop equipment, access, documents, warranties and operational constraints before system selection.

Open inspection authority
2 · Qualify assembly & deck

Resolve layers, moisture, insulation, cover board, vapor control, deck condition, attachment, corrosion and concealed-condition procedures.

Open deck & attachment
3 · Choose lifecycle path

Compare localized repair, restoration, recover and full replacement using verified condition—not the sales label on a proposal.

Compare recover
4 · Specify system & wind design

Coordinate deck, insulation, attachment, roof zones, perimeters, flashings, drainage, equipment and current approvals as one tested assembly.

Open wind & code
5 · Phase, verify & close out

Define occupied-building controls, notices, weather limits, manufacturer inspections, change authorization, warranties and the permanent roof file.

Compare system families
System-specialist handoffs

Once the building conditions are known, move into the child authority that owns the final roof-system design.

Low-slope assembly

Commercial Flat Roof Replacement

TPO, PVC/KEE, EPDM, modified bitumen, BUR, insulation, cover board, taper, drainage and low-slope transition design.

Open flat replacement
Metal assembly

Commercial Metal Replacement

Standing seam, structural or architectural panels, metal/finish, clips, fasteners, thermal movement, substrate and coastal exposure.

Open metal replacement
Tile assembly

Commercial Tile Replacement

Concrete or clay tile, structural load, underlayment, attachment, repetitive details, access and mixed low-slope transitions.

Open tile replacement
Shingle / steep slope

Commercial Shingle Replacement

Architectural shingles, underlayment, ventilation, flashings, deck, repetitive buildings, transitions and phased steep-slope work.

Open shingle replacement
Verified Aastro commercial field evidence

Replacement planning has to survive actual rooftop conditions and building operations.

These images are used as field/process evidence. They support the investigation, staging and lifecycle discussion without implying that one photo represents every commercial replacement assembly.

Aastro commercial roof replacement membrane work in West Palm Beach
West Palm Beach · replacement field evidenceMembrane installation and production controls

Verified Aastro commercial replacement field media showing active rooftop production and fall-protection conditions.

Aastro commercial roofing crew coordinating rooftop material handling
Commercial rooftop · logistics evidenceStaging, lifting and crew coordination

Commercial replacement scopes have to coordinate crane or lift logistics, material staging, access and occupied-building safety.

Aastro commercial roof service crew evaluating a rooftop condition in Boca Raton
Boca Raton · lifecycle evidenceRepairability must be separated from replacement need

Verified service media reinforces the lifecycle boundary: defined repair conditions should not automatically be converted into full replacement.

FLCCC1330967Florida Certified Roofing Contractor
INSLicensed and insuredCurrent certificates available upon request
MFGSystem-specific credentialsCertainTeed, SOPREMA and FiberTite pathways
OPSOccupied-property planningAccess, phasing, notices and daily controls
Verify Credentials
Direct Answer

What is a commercial roof replacement?

A commercial roof replacement is the installation of a complete permitted roofing assembly after the existing roof, substrate, moisture, drainage, equipment, perimeter and operational conditions have been evaluated. The visible membrane, metal panel, tile or shingle is only one part of the system.

Important: A membrane brand or warranty term does not define the full scope. The deck, insulation, cover board, attachment, flashings, drainage, penetrations, testing, inspections, corrective work and written warranty requirements must also be identified.
Property-Specific Planning

Commercial Replacement Changes With the Property Type

The roof must support the way the property is occupied, operated, maintained and funded.

01

Condominiums and HOAs

Board approvals, reserve planning, resident notices, multiple roof areas, access, phasing, balconies, high-rise logistics and closeout records.

02

Multifamily Communities

Building sequencing, resident safety, occupied-unit protection, repetitive details, material continuity and property-wide documentation.

03

Retail, Office and Hospitality

Customer access, tenant operations, loading, noise, odors, rooftop equipment, business hours and interior protection.

04

Warehouse and Industrial

Large spans, deck type, critical inventory, exhaust, chemicals, grease, puncture risk, production schedules and high-value operations.

05

Institutional and Specialty

Schools, healthcare, houses of worship, government, recreation and other properties with specialized safety, access and continuity needs.

Decision Framework

Repair, Restore, Recover or Replace?

The correct path depends on the verified assembly—not the sales label attached to the proposal.

Repair

Addresses a defined defect when surrounding materials, attachment, substrate and moisture conditions remain serviceable.

Restore

Renews a compatible and sufficiently dry existing roof using a designed restoration system when candidacy requirements are satisfied.

Recover

Adds an approved assembly over a qualified existing roof when layers, moisture, attachment, fire, wind, height and manufacturer requirements allow it.

Replace

Removes or substantially reconstructs the roofing assembly when broader deterioration, moisture, drainage, attachment or lifecycle conditions require it.

Investigation Before Design

Eight Conditions Should Be Understood Before the System Is Selected

Skipping the investigation can move concealed risk into change orders, schedule delays or a system that does not match the building.

Existing Roof AssemblyMembrane or covering, layers, attachment, insulation, cover board, vapor control and previous repairs.
Deck and StructureSteel, concrete, lightweight concrete, wood, gypsum, tectum or other substrate and its condition.
MoistureSurvey findings, core cuts, wet insulation, trapped moisture, leak history and interior evidence.
DrainageDeck slope, drains, scuppers, gutters, leaders, overflows, ponding areas and discharge.
Rooftop EquipmentHVAC curbs, exhaust, piping, conduits, supports, solar, obsolete penetrations and future replacements.
Perimeter and DetailsParapets, edges, coping, walls, flashings, door thresholds, expansion joints and transitions.
Operations and AccessOccupancy, tenants, residents, loading, security, safety, working hours and interior protection.
Warranty and CloseoutExisting warranty, manufacturer pathway, inspections, testing, corrective work, maintenance and roof-file requirements.
Interactive System Comparison

Compare Commercial Roof-System Directions

Start with the building, exposure and assembly. Then compare products, attachments and warranty pathways.

Complete Assembly

A Commercial Roof Replacement Is a Twelve-Part System

Every part should be described in the proposal or deliberately identified as an assumption, allowance, alternate or exclusion.

01

Existing-Roof Removal

Tear-off, partial removal, recovery preparation, disposal and temporary dry-in.

02

Structural Deck

Deck type, deterioration, corrosion, attachment, repairs and engineering escalation.

03

Air and Vapor Control

Building use, interior humidity, deck type, climate, existing assembly and condensation risk.

04

Insulation

Thermal value, flute fill, layers, fastening, taper, crickets, sumps and saddles.

05

Cover Board

Protection from traffic, fire, moisture, hail and concentrated rooftop activity.

06

Attachment

Adhesive, mechanical attachment, induction welding, hot asphalt, ballast or approved hybrid.

07

Roof Membrane or Covering

TPO, PVC, KEE, modified bitumen, BUR, metal, tile, shingle or specialty assembly.

08

Flashings and Curbs

Walls, equipment, pipes, drains, skylights, expansion joints and transitions.

09

Perimeter and Edges

Coping, edge metal, nailers, fascia, gutters, gravel stops and wind-zone requirements.

10

Drainage and Overflow

Primary drains, scuppers, gutters, leaders, overflow routes, slope and discharge.

11

Testing and Inspections

Manufacturer inspections, seam testing, adhesion checks, flood testing or other project controls.

12

Closeout and Roof File

Permits, final inspections, warranties, photographs, as-builts, maintenance and repair stock.

Verified Aastro commercial rooftop crew coordination
Moisture and Tear-Off Strategy

Wet Insulation Changes the Project

Moisture can reduce thermal performance, corrode decks or fasteners, affect attachment, travel far from visible leaks, and disqualify some restoration or recovery approaches. The investigation should define what is known before production and how additional findings will be handled.

Use More Than One Source of EvidenceLeak history, interior observations, survey data, core cuts, deck inspection and field conditions should be reconciled.
Map Known and Suspected AreasDrawings and photographs help the owner compare removal assumptions and track production findings.
Define Unit Prices and AuthorizationThe contract should explain how extra insulation, deck repair or concealed work is documented and approved.
Separate Survey Limits From GuaranteesNo survey method should be represented as finding every concealed wet area under every condition.
Drainage and Tapered Design

Replacement Is the Best Time to Correct Drainage—When the Structure and Details Allow It

Drainage improvements must be coordinated with deck slope, drains, scuppers, parapets, door thresholds, equipment, flashing heights and overflow requirements.

ConditionWhat It May IndicateReplacement-Planning ResponseImportant Limitation
Blocked drain or leaderMaintenance or localized outlet restrictionClean, test, document and verify downstream dischargeCleaning does not correct deck deflection or inadequate slope
Localized ponding near equipmentCricket, curb or support interruptionEvaluate tapered crickets, saddles, relocation or curb modificationEquipment and service clearances may limit options
Broad ponding areaDeck deflection, compressed insulation or incomplete taperSurvey elevations and design a coordinated drainage approachTapered insulation cannot correct every structural condition
Low wall or door thresholdInsufficient flashing height for added insulationCoordinate wall, curb, threshold or structural modificationsAdding thickness without detail changes can create new failures
Overflow absent or ineffectiveLimited redundancy during blockage or extreme rainfallReview code, design and discharge options with the project teamOverflow design may require architectural or structural coordination
Occupied-Building Coordination

The Roof Work Must Fit the Property’s Operations

The written plan should identify who communicates, who authorizes changes, and how daily risks are controlled.

Tenant and Resident Notices

Advance notice, work areas, noise, odors, access limits, vehicle movement and emergency contacts.

Interior Protection

Sensitive inventory, ceilings, dust, vibration, temporary leaks, equipment and after-hours response.

Loading and Staging

Cranes, conveyors, hoists, material storage, parking, loading docks, fire lanes and public access.

Daily Weather Control

Tear-off limits, temporary dry-in, forecast review, shutdown criteria and end-of-day inspection.

Noise and Odor Planning

Business hours, hospitality, healthcare, schools, restaurants and sensitive occupants may require special sequencing.

Rooftop Trade Coordination

HVAC, plumbing, electrical, solar, security and other trades must protect the new system and respect warranty rules.

Safety and Access

Controlled roof access, warning lines, fall protection, ladders, hatches, escorts and restricted zones.

Daily Documentation

Completed areas, open conditions, weather, photos, changes, incidents, inspections and next-day plans.

Conceptual Phasing Worksheet

Divide a Portfolio Into Planning Phases

This worksheet divides the entered roof area and buildings across phases. It does not establish cost, constructability, warranty eligibility or the correct sequence.

30,000 sq. ft. per phaseApproximately 2 roof areas per phase over a 4-year planning horizon.
Capital Planning

Sequence the Risk—not Just the Buildings

Phasing should consider condition, leak history, moisture, operations, warranty continuity, tie-ins, drainage, access, material availability, escalation and the consequences of delaying each area.

  • Prioritize active risk and wet assemblies.
  • Group compatible systems and details where practical.
  • Define temporary tie-ins and future connection points.
  • Preserve manufacturer inspection and warranty continuity.
  • Budget for concealed conditions and annual escalation.
  • Maintain one property-wide roof file across every phase.
Featured Manufacturer Pathways

Credentials Matter Most When They Match the Exact Roof System

A credential can support training, project registration and warranty access. It does not replace project-specific design, approval, inspection or written warranty requirements.

CertainTeed Commercial Roofing

Featured for applicable low-slope, modified-bitumen and liquid-applied commercial pathways, with current project registration and warranty requirements controlling.

Exact credential status and logo use should be reconfirmed before live publication.

SOPREMA

Applicable modified-bitumen, PVC, liquid-applied, waterproofing and restoration systems may be evaluated through SOPREMA’s current authorized-contractor and warranty process.

System, registration, inspections and written warranty terms control.

FiberTite / Seaman Corporation

KEE membrane systems may be appropriate for critical operations, puncture, chemical, grease and demanding commercial environments.

Use the current Authorized Applicator designation and agreement when the system is specified.

Tile and Mixed-Slope Expertise

Westlake Newpoint concrete tile, US Tile clay tile and related components may be evaluated for applicable commercial, condominium and mixed-slope properties.

Product expertise is not represented as certification without a current documented credential.
GAF
Johns Manville
Carlisle SynTec
Versico
Mule-Hide
Elevate
Tremco
Polyglass
Sika Sarnafil
BITEC
Proposal Comparison

Require the Proposal to Define the Commercial Risk

The lowest number is not necessarily the lowest total project risk.

01

Existing Assembly

Known layers, deck, attachment, survey data, core cuts and assumptions.

02

Removal and Disposal

Tear-off limits, wet-material handling, staging, disposal and daily dry-in.

03

Deck and Concealed Work

Unit prices, allowances, documentation, engineering and authorization.

04

Thermal and Drainage Design

Insulation, taper, cover board, crickets, drains, scuppers and flashing heights.

05

Wind and Attachment

Field, perimeter and corner zones; deck; fasteners; adhesives; approvals and calculations.

06

Flashings and Equipment

Curbs, walls, penetrations, supports, expansion joints, obsolete equipment and trades.

07

Occupied-Property Controls

Notices, access, noise, odors, interior protection, working hours and emergency response.

08

Phasing and Temporary Conditions

Limits, tie-ins, sequencing, delayed areas, weather and future connections.

09

Testing and Inspections

Manufacturer inspections, seam testing, adhesion checks, flood testing and corrections.

10

Warranty Eligibility

Exact warranty type, term, exclusions, registration, inspections and maintenance.

11

Closeout Documentation

Permits, photographs, as-builts, warranties, repair stock and roof-file contents.

12

Exclusions and Alternatives

Clearly priced options, scope gaps, owner responsibilities and bid-comparison assumptions.

Commercial Replacement Process

Ten Controlled Steps From Investigation to Closeout

01

Define the Property

Buildings, roof areas, occupancy, contacts, authority and objectives.

02

Review Records

Plans, warranties, repairs, leaks, reports, permits and prior scopes.

03

Investigate the Roof

Assembly, cores, moisture, deck, drainage, equipment and details.

04

Compare Strategies

Repair, restoration, recovery, replacement, phasing and alternates.

05

Develop the Assembly

Materials, insulation, attachment, wind design, details and approvals.

06

Coordinate Operations

Access, notices, staging, interior protection, safety and weather controls.

07

Write the Proposal

Scope, quantities, unit prices, exclusions, schedule and warranty pathway.

08

Permit and Procure

Approvals, submittals, materials, manufacturer registration and logistics.

09

Install and Document

Daily production, testing, inspections, changes, photos and quality control.

10

Close Out and Maintain

Final inspections, warranty, as-builts, roof file, training and maintenance plan.

Seven-Question Commercial Scope Planner

Route the Property to the Right Next Step

The planner provides a controlled recommendation. It does not diagnose the roof, establish price, reserve labor, determine insurance coverage or guarantee warranty eligibility.

1. What type of property is involved?
2. What roof system is present?
3. What is the current water condition?
4. What condition has been documented?
5. How sensitive are property operations?
6. What is the primary objective?
7. What is the planning timeline?
Commercial Consultation Intake

Give Aastro the Information Needed to Prepare the First Conversation

The intake is designed for commercial, multifamily, condominium, HOA, industrial and institutional properties. It is not an automated residential estimate.

  • Property and roof-area identification
  • Current roof systems and reported conditions
  • Occupancy and operational constraints
  • Decision authority and planning timeline
  • Known reports, surveys, warranties or drawings

Project note:Submitting this form opens a pre-addressed email to Aastro Roofing. Send that email to complete your request. For immediate service, call 561-409-3280.

Call Aastro

Submitting this form opens a pre-addressed email to Aastro Roofing. Send that email to complete your request. For immediate service, call 561-409-3280.

Commercial Service Areas

Palm Beach and Broward Counties

Standard online coverage is controlled centrally. Unusual, remote or portfolio locations may require manual review.

Palm Beach County

Boca RatonDelray BeachBoynton BeachLake Worth BeachWest Palm BeachPalm BeachPalm Beach GardensRiviera BeachNorth Palm BeachWellingtonRoyal Palm BeachGreenacresLantanaPalm SpringsAtlantisHypoluxoSouth Palm BeachManalapanOcean RidgeGulf StreamBriny BreezesHighland BeachJupiterJuno BeachTequestaJupiter Inlet ColonyLake Clarke ShoresMangonia ParkHaverhillLoxahatchee Groves

Pahokee and Belle Glade are excluded from standard website coverage. Other far northwestern areas may require manual review.

Broward County

Fort LauderdaleDeerfield BeachPompano BeachLighthouse PointHillsboro BeachLauderdale-by-the-SeaSea Ranch LakesWilton ManorsOakland ParkCoconut CreekCoral SpringsParklandMargateTamaracNorth LauderdaleLauderdale LakesLauderhillSunrisePlantationDavieCooper CityWestonSouthwest RanchesPembroke PinesMiramarHollywoodHallandale BeachDania BeachPembroke ParkWest ParkLazy Lake

Coverage and scheduling remain subject to property type, access, scope, crew availability and operational requirements.

Project verification gate

Educational planning does not freeze the final roof specification. Before production, the project team must recheck the permit jurisdiction, current Florida Building Code requirements, exact product approvals or Miami-Dade NOAs where applicable, manufacturer instructions, tested assembly, design pressures, deck and attachment, drainage, fire classification, warranty registration and written project documents.

  • Do not equate an advertised membrane or panel rating with the project design pressure.
  • Do not promise restoration or recover candidacy before moisture, attachment, layers and substrate are qualified.
  • Do not represent a manufacturer warranty as automatic; registration, approved components, inspections and corrections may control eligibility.
  • Do not treat storm observations as an insurance coverage determination; the carrier controls coverage and payment.
  • Concealed deck, insulation, moisture or equipment conditions must follow the written authorization/change procedure.
Commercial Roof Replacement FAQs

Direct Answers for Owners, Managers and Boards

What is a commercial roof replacement?

A commercial roof replacement is a documented project that removes or properly incorporates the existing roof as allowed by the approved scope, evaluates the deck and concealed moisture, and installs a complete permitted roofing assembly. The scope may include air or vapor control, insulation, tapered drainage, cover board, attachment, membrane or roof covering, flashings, penetrations, perimeter details, testing, inspections, documentation, and warranty registration.

When is replacement more appropriate than another repair?

Replacement becomes more important when moisture or deterioration is widespread, repairs are recurring, attachment or substrate conditions are unreliable, drainage cannot be responsibly corrected through limited work, materials are incompatible or unavailable, the roof no longer supports operations or warranty goals, or the remaining value of another repair is limited. Roof age alone does not decide the outcome.

Can an existing commercial roof be restored instead of replaced?

Sometimes. Restoration can be responsible when the existing assembly is compatible, sufficiently dry, adequately attached, structurally serviceable, and capable of receiving the proposed system. Wet insulation, widespread membrane failure, unresolved ponding, structural deflection, inadequate flashing heights, or incompatible materials may make restoration inappropriate.

Does every commercial replacement require complete tear-off?

No. Tear-off, partial tear-off, recovery, and hybrid approaches depend on existing layers, moisture, deck condition, code limitations, wind design, fire classification, attachment, insulation, drainage, flashing heights, manufacturer requirements, and the written project scope. The existing assembly must be investigated before a responsible approach is selected.

What is a commercial roof moisture survey?

A moisture investigation uses appropriate non-destructive or invasive methods to help identify suspected wet areas within the roof assembly. Results may be supplemented by core cuts, test cuts, photographs, and deck observations. No single survey method should be treated as infallible, and findings must be interpreted in the context of the actual assembly.

What is an NDL commercial roof warranty?

An NDL, or no-dollar-limit, warranty is a manufacturer system warranty with defined terms that may cover eligible repairs without a stated dollar cap during the warranty period. Eligibility depends on the exact system, authorized contractor status, project registration, manufacturer review, inspections, corrective work, maintenance, exclusions, and the written warranty. It is not automatic because a manufacturer name appears in the proposal.

Can a large commercial roof replacement be phased?

Yes, when roof areas, buildings, drainage, tie-ins, temporary conditions, budgets, operations, and warranty requirements support a phased plan. A responsible phasing strategy should identify limits of work, temporary tie-ins, future connection points, sequencing, weather exposure, material continuity, escalation risks, and how delayed areas will be monitored.

How does Aastro coordinate roofing on an occupied property?

Planning may include resident or tenant notices, access restrictions, loading and staging, noise and odor controls, interior protection, after-hours or off-peak work where appropriate, emergency contacts, weather contingencies, equipment shutdown coordination, and daily cleanup. The exact plan depends on the building, roof system, safety requirements, and approved scope.

Can a roof be replaced while HVAC equipment remains in service?

Often, but rooftop equipment must be evaluated individually. Curbs, service clearances, ductwork, piping, condensate, electrical conduits, supports, obsolete penetrations, equipment replacement schedules, and temporary shutdowns may affect the design. Roofing work should be coordinated with the relevant trades rather than forcing the roof around unresolved equipment conditions.

How should drainage be handled during replacement?

The project should document existing drains, scuppers, gutters, leaders, overflow provisions, deck slope, ponding areas, and discharge conditions. Tapered insulation, crickets, saddles, sumps, drain elevation changes, or structural corrections may be considered where appropriate. A reflective membrane alone does not correct poor drainage.

How do we compare TPO, PVC, KEE, modified bitumen, BUR, metal, and steep-slope systems?

The comparison should begin with the property, roof slope, deck, existing assembly, operations, exposure, drainage, traffic, chemicals, grease, heat, puncture risk, wind pressures, fire requirements, maintenance, budget, and warranty objectives. There is no universal best commercial roofing system.

What concealed conditions can change the final commercial roof scope?

Common concealed conditions include wet insulation, deteriorated decking, corrosion, damaged lightweight concrete, trapped moisture, abandoned penetrations, undocumented layers, insufficient attachment, low flashing heights, deteriorated wood nailers, unsafe curbs, hidden drainage problems, and contaminated materials. The contract should define allowances, unit prices, documentation, authorization, and change-order procedures.

Does a new commercial roof guarantee lower insurance costs?

No. A permitted replacement and improved documentation may support underwriting review, but the insurer, policy, property use, roof geometry, wind mitigation, fire classification, age rules, inspection findings, claim history, and other property characteristics control coverage, renewal, and pricing.

How should two commercial roofing proposals be compared?

Compare the complete assembly rather than only membrane brand or total price. Review removal assumptions, deck and moisture investigation, insulation, cover board, attachment, wind zones, flashings, penetrations, drainage, equipment, temporary protection, phasing, exclusions, unit pricing, testing, inspections, closeout, maintenance, and exact warranty eligibility.

How long does a commercial roof replacement take?

Duration depends on roof area, number of buildings, system, tear-off volume, deck repairs, insulation, drainage corrections, equipment, access, occupied-property restrictions, weather, inspections, material availability, phasing, and working hours. A responsible schedule is developed after the scope and site conditions are verified.

Where does Aastro provide commercial roof replacement?

Aastro serves commercial, multifamily, condominium, HOA, retail, office, warehouse, industrial, hospitality, and institutional properties throughout standard service areas in Palm Beach and Broward Counties. Pahokee and Belle Glade are excluded from standard website coverage, and remote or unusual locations may require manual review.

Why should commercial roof replacement begin with the deck and moisture conditions instead of the membrane brand?

Because the deck, existing layers, wet insulation, attachment, drainage and building use can limit which assemblies can be installed and how they must be attached. A membrane brand alone does not establish a complete commercial replacement scope.

What is the practical difference between commercial roof recover and full replacement?

A recover retains a qualified existing roof or portions of it as part of the new assembly. Full replacement removes or substantially reconstructs the existing roofing assembly. Layers, moisture, attachment, fire classification, height, wind design, deck condition, manufacturer rules and code requirements control whether recover is eligible.

How are roof-zone design pressures handled on a commercial replacement?

The project must use the applicable building geometry, height, exposure, roof zones and governing design criteria to select a tested assembly with attachment that meets the required pressures. The exact approval, substrate, fasteners, spacing, insulation and perimeter details must be verified for the project before installation.

Primary Manufacturer Resources

Verify Current Systems, Warranties and Applicator Requirements

Product pages and warranty programs change. Final specifications should use current official documents for the exact project.

Commercial Consultation

Start With the Property, the Existing Assembly and the Decision Process

Aastro can organize the first commercial roof replacement conversation around the buildings, roof systems, reported conditions, operations, authority, budget horizon and documentation already available.

Verified Aastro Media

Commercial project proof across multiple roof systems.

Actual commercial and multifamily imagery now supports the general commercial replacement hub.

Open Projects & Media →
Ocean Place commercial tile roof replacement in Delray Beach — completed white tile roof
Delray Beach · Commercial tileOcean Place commercial tile roof replacement in Delray Beach — completed white tile roof
Laurel Cove Townhomes tile roof replacement in North Lauderdale
North Lauderdale · Multifamily tileLaurel Cove Townhomes tile roof replacement in North Lauderdale
Commercial metal roof replacement in Delray Beach
Delray Beach · Commercial metalCommercial metal roof replacement in Delray Beach
High-rise flat roof in Boca Raton
Boca Raton · High-rise flatHigh-rise flat roof in Boca Raton