Skip to content
Florida Certified Roofing Contractor CCC1330967 Palm Beach & Broward Counties Call 561-409-3280
Aastro Roofing CompanyFour generations of roofing tradition
Illustrative commercial shingle roofing system in South Florida
Commercial Roof Replacement

Commercial Shingle Roof Replacement

Complete steep-slope shingle systems for condominiums, HOAs, multifamily communities, clubhouses, offices, hospitality, institutional and mixed-use properties throughout Palm Beach and Broward Counties.

CertainTeed-first system designPressure-zone fasteningSecondary water resistancePortfolio phasing
Wind & Code Guide
50-route website modelIntegrated commercial replacement pathway
Current Aastro credentialCertainTeed ShingleMaster™ PRO
Field / perimeter / cornerPressure-zone attachment review
Aastro Project EvidenceCommercial shingle project in Palm Beach
Commercial Shingle Replacement Contract

Five Controls Before a Shingle Specification Becomes a Production Roof

Commercial shingle work must connect the building, the deck, the water-control layers, the tested roof covering, wind-zone fastening, transitions, phasing and the written closeout file. The visible shingle is only one component.

1

Confirm Suitability

Verify property type, roof geometry, mean roof height, exposure, current roof condition and whether shingles are a permitted and supportable direction.

2

Define the Assembly

Document deck, wood, secondary water resistance, underlayment, starter, field shingles, ridge, ventilation, flashings and accessories.

3

Verify Wind & Approval

Confirm exact product approval or NOA, limits of use, field/perimeter/corner fastening, substrate and engineering where required.

4

Coordinate the Property

Plan mixed-roof transitions, color lots, repair stock, resident or tenant notices, access, phasing, temporary dry-in and concealed-condition authorization.

5

Execute & Close Out

Install to the approved assembly, document inspections and concealed work, reconcile warranties and deliver one controlled final roof file.

Planning boundary: this authority page does not guarantee insurance acceptance, impact performance, energy savings, a specific wind rating, warranty eligibility, final concealed-condition cost or a fixed production schedule. Permit-time code, current product approval/NOA, manufacturer instructions, project engineering and the signed contract control.
Direct Answer

What Does a Commercial Shingle Roof Replacement Include?

It replaces and documents the complete steep-slope assembly—not only the visible shingles. The scope should address tear-off, structural deck, concealed wood, deck attachment, secondary water resistance, underlayment, starter, field shingles, hip and ridge, flashing, ventilation, mixed-roof transitions, pressure-zone fastening, inspections, cleanup and written warranty terms.

Roof coveringExact shingle family, color, approval and warranty
Water-control layersDeck, seam tape, underlayment, valleys and flashings
Commercial executionPhasing, protection, notices, access and closeout
Aastro commercial shingle roof replacement project in Palm Beach
Property-Specific Planning

The Property Type Changes the Shingle Replacement Strategy

Decision authority, access, repeated buildings, roof height, mixed-slope transitions and occupant protection can change both the design and the proposal.

HOA

Condominium & HOA

Board approvals, physical samples, resident notices, repetitive roof details, association documents, common-property protection and repair stock.

MF

Multifamily & Portfolio

Building-by-building conditions, color-lot control, phases, budgeting, tenant access, temporary tie-ins, standardized details and closeout records.

COM

Office, Clubhouse & Hospitality

Business continuity, guest experience, parking, staging, rooftop equipment, signage, entrances, noise and daily weather protection.

INST

Institutional & Mixed Use

Occupied operations, fire and code documentation, multiple decision makers, steep-to-low-slope interfaces, inspections and capital planning.

Commercial Shingle System Directions

Choose the Performance and Appearance Objective—Then Verify the Approved Assembly

The interactive comparison is educational. Final selection depends on current availability, exact product approval, owner type, building height, slope, warranty and project documents.

Specialist Handoffs

Move Deeper Only When the Decision Actually Requires It

This authority owns the commercial shingle replacement decision. These pages own the deeper system, investigation, substrate and repair questions.

Shingle System Assembly

Starter, field shingles, ridge, ventilation, water-control layers, accessories and complete-system logic.

Open Shingle System
Commercial Inspection

Unknown layers, height, moisture, active conditions, documentation gaps, representative buildings and capital-planning evidence.

Open Commercial Inspections
Deck & Attachment

Wood, steel or other substrate conditions, pullout/attachment questions, concealed deterioration and authorization controls.

Open Deck & Attachment
Commercial Repair

Localized or recurring defects where a repairability review should occur before committing to full replacement.

Open Commercial Repair
Complete Assembly

Twelve Coordinated Parts of a Commercial Shingle Roof

The proposal should define responsibility for every layer and detail—not use the shingle brand as a substitute for a complete scope.

01

Existing-Roof Investigation

Layers, slope, repairs, moisture, penetrations, roof height, mixed systems and access.

02

Removal & Protection

Tear-off, interior and landscaping protection, staging, weather planning and disposal.

03

Structural Deck

Solid sheathing, thickness, deterioration, deflection, attachment and fastener engagement.

04

Deck Attachment

Renailing or supplemental attachment, current code, inspection and documentation.

05

Secondary Water Resistance

Qualifying seam tape, self-adhered deck membrane or other documented assembly.

06

Underlayment

Synthetic, self-adhered or approved multi-layer water-control system.

07

Starter & Perimeter

Eaves, rakes, drip edge, starter attachment, adhesive and edge-zone details.

08

Field Shingles

Exact product, exposure, layout, nail zone, fasteners, sealant and color lot.

09

Hip & Ridge

Purpose-made caps, fastener length, ventilation interfaces and high-profile details.

10

Flashings & Penetrations

Valleys, walls, chimneys, pipes, skylights, curbs and dissimilar materials.

11

Ventilation & Thermal Conditions

Intake, exhaust, attic moisture, insulation, ductwork and conversion impacts.

12

Closeout & Roof File

Permits, inspections, photos, approvals, warranty, repair stock and maintenance plan.

Florida Wind Design and Product Approval

Roof Height, Pressure Zones and Fastening Must Be Verified Before Selection

Commercial shingle roofs are controlled by the current Florida Building Code, the exact product approval or NOA where applicable, project geometry and manufacturer instructions.

33′

High-Rise and Mean-Roof-Height Gate

In the HVHZ, asphalt shingles are generally limited to a 33-foot mean roof height unless the specific approved assembly expressly permits a taller installation. High-rise and exposed projects require product-specific review—not an assumption based on the shingle brand.

Open Wind & Code Guide
6N

HVHZ Fastening

RAS 115 requires installation in accordance with the product approval and no fewer than six approved nails per shingle in the HVHZ. Nail type, length, penetration, location, starter, perimeter adhesive and valleys also matter.

Read Current RAS 115
Design itemWhat controls itWhy it changes cost or performance
Field, perimeter and corner zonesBuilding geometry, height, exposure and current pressure calculationsEdges and corners may require enhanced attachment, adhesive, deck work or different approved details
Shingle fasteningProduct approval, manufacturer nail zone, HVHZ requirements and deckFastener count, type, penetration and placement affect uplift resistance and warranty eligibility
Starter and ridgeApproved system components and warranty requirementsGeneric cut shingles may not provide the same approved edge or ridge performance
Roof heightProduct approval and jurisdictionTaller buildings may require a different product, engineering or another roof system
Mixed roof areasShingle and low-slope approvals plus transition designAdditional membrane, flashing, removal and trade coordination may be required
Deck, Water Control and Hidden Conditions

The Strongest Shingle Cannot Compensate for a Weak or Wet Substrate

Aastro roof-deck replacement on a South Florida project

Deck and Concealed Wood

Commercial scopes should define included wood, unit prices, authorization thresholds, documentation and how structural or widespread deterioration will be handled after tear-off.

Secondary Water Resistance

Seam tape, self-adhered deck membranes and other configurations should be identified by exact assembly. Underlayment alone should not be labeled as qualifying SWR without documentation.

Deck Attachment

Existing sheathing fasteners, spacing, condition and required reinforcement should be photographed and inspected before they are covered.

Moisture and Prior Repairs

Repeated leaks, trapped moisture, wet insulation at mixed-slope areas and undocumented repairs can change tear-off, drying and replacement strategy.

Recovery Restrictions

Recovery is not automatic. In the HVHZ, shingles cannot be recovered over wood shingles, shakes, slate, tile or metal shingles.

Thermal Conversion Gate

Changing from Tile to Shingles Can Change the Building’s Heat-Transfer Behavior

Tile may provide thermal mass and an air space beneath the covering. A direct-to-deck shingle system may not reproduce those effects. The correct comparison includes color, solar reflectance, insulation, attic or plenum design, ventilation, air sealing and duct location.

Use the Complete Assembly—Not a Material Myth

  • Do not promise that shingles will make a building hotter or cooler without evaluating the assembly.
  • Review the existing tile profile and air space before conversion.
  • Evaluate attic insulation, ventilation and rooftop HVAC or ductwork.
  • Consider lighter or reflective shingle options where appropriate and approved.
  • Document the expected change for boards, owners and facility managers.

Thermal Conversion Screening

Select the conditions and run the review.
Mixed-Slope Buildings

Shingles and Low-Slope Roofing Must Be Designed Together

Commercial shingle roofs frequently connect to flat roofs, parapets, walls, rooftop equipment and drainage. The interface is often more important than the field shingle.

LOW

Shingle-to-Membrane

Removal width, underlayment continuity, membrane height, termination, counterflashing and future serviceability.

WALL

Walls and Parapets

Step flashing, headwall flashing, stucco or siding removal, counterflashing, sealants and responsibility boundaries.

HVAC

Equipment and Curbs

Condensate, service traffic, roof access, abandoned penetrations, curbs, supports and trade coordination.

DRAIN

Valleys and Drainage

Crickets, saddles, gutters, scuppers, leaders, ponding and concentrated discharge onto lower roofs.

Portfolio and Association Planning

Standardize What Should Repeat—and Document What Cannot

Multiple buildings require more than multiplying one estimate. Conditions, roof areas, access, lots, details and resident impacts should be mapped by phase.

Conceptual Phasing Worksheet

Educational planning only. This is not a construction estimate, schedule or quantity takeoff.

Approximate area per phase30,000 sq. ft.

Approximately 3 buildings per phase before condition, access, weather, unit mix and budget adjustments.

Proposal and Warranty Review

Two Proposals Using the Same Shingle Brand May Describe Different Roofs

System Components

  • Exact shingle family and color
  • Starter and hip/ridge
  • Underlayment and SWR
  • Ventilation and flashings
  • Fasteners and adhesives

Commercial Scope

  • Phasing and daily dry-in
  • Protection and access
  • Wood and hidden-condition procedure
  • Mixed-roof interfaces
  • Closeout and repair stock

Written Warranty

  • Owner type and registration
  • Material versus workmanship coverage
  • Commercial/group-owned term
  • Maintenance and exclusions
  • Transfer and notification rules
Warranty boundaryA warranty term is not a predicted roof life. The signed contract and written manufacturer and workmanship warranties control exact coverage, exclusions, maintenance, transferability and service procedures.
Verified Aastro Project Evidence

Commercial Shingle Work, System Components and Field Conditions

These are approved Aastro project and technical images. Each photograph documents one condition or project; it is not a universal detail for every building.

Before · Palm Beach

Twelve Oaks Shingle and Flat Roof — Before

Approved Aastro footage documenting the existing mixed shingle-and-low-slope roof before replacement.

View approved original in Drive →
After · Palm Beach

Twelve Oaks Shingle and Flat Roof — After

Approved Aastro footage showing the completed mixed-roof project and final exterior appearance.

View approved original in Drive →
Manufacturer and Product-Family Comparison

CertainTeed Leads—Then the Exact Project Determines the Product

Aastro’s current public CertainTeed profile lists ShingleMaster™ PRO and Low-Slope Roofing Master™ PRO. Exact product, regional availability, product approval, owner type, registration and written warranty remain project-specific.

CertainTeed Landmark shingle product
Primary Shingle Manufacturer

CertainTeed Complete-System Direction

Commercial and group-owned projects may compare Landmark, Landmark PRO, Landmark Premium, ClimateFlex, Grand Manor, Carriage House, Presidential Shake and qualifying accessory systems. Some premium families publish separate group-owned or commercial limited-warranty terms.

Landmark / Landmark PRO

Architectural laminated directions for standardization, color selection and complete-system planning.

Official product page →

Grand Manor / Carriage House

Premium slate-look and scalloped designs with separate group-owned or commercial limited-warranty language published for current products.

Official product page →

Presidential Shake

Luxury shake appearance for clubhouses, hospitality and architecturally controlled properties, subject to approval and availability.

Official product page →

GAF Timberline

HDZ, UHDZ and reflective directions with product-specific components, approvals and warranty terms.

Official product family →

Owens Corning Duration

Architectural shingle and system-component options requiring current regional product and warranty verification.

Official roofing resources →

TAMKO Titan XT / Heritage

Architectural and performance directions with product-specific impact, wind and regional availability boundaries.

Official product page →

Malarkey

Architectural and polymer-modified shingle families where distribution, approval and project requirements support them.

Official product family →
Credential Hierarchy

Use the Credential That Matches the Roof System

Aastro Roofing Company round badge
Current Public CertainTeed Profile

ShingleMaster™ PRO — Since 2016

This is Aastro’s current residential/shingle credential shown on CertainTeed’s public profile. Credential status does not automatically approve a specific product, building height, assembly or warranty.

Verify Directly with CertainTeed
Verified Aastro Field Evidence

Commercial Shingle Decisions Are Made in the Assembly, Not on a Color Board

These controlled field images support the commercial-shingle decision process. They are evidence of Aastro roof work and assembly conditions; they are not a substitute for the exact project investigation or permit-time specification.

Large commercial shingle roof system in Palm Beach
Commercial steep slopeLarge commercial shingle roof

Verified Aastro commercial shingle context supports system standardization, repetitive details and portfolio planning.

Plywood seam tape for secondary water resistance
Water-control layerSecondary water resistance

Deck preparation and seam treatment sit below the visible shingles and materially affect the complete roof assembly.

Ridge ventilation on a shingle roof
Ventilation / heat managementRidge ventilation and attic coordination

Thermal and moisture performance depend on the roof and attic assembly, not on shingle color alone.

Commercial Shingle Project Planner

Seven Questions to Identify the Correct Investigation Path

The planner does not approve a roof system or provide engineering. It routes the property toward the right technical review.

Project Conditions

Commercial Consultation

Request a Commercial Shingle Roof Investigation

Submitting this form opens a pre-addressed email to Aastro Roofing. Send that email to complete your request. For immediate service, call 561-409-3280.

Call 561-409-3280
Commercial Replacement Process

From Investigation to Documented Closeout

1

Property and Authority Review

Decision makers, property type, access, records and goals.

2

Roof Investigation

Systems, moisture, deck, slope, height, details and repairs.

3

Code and Approval Review

Jurisdiction, product approval, pressure zones and fastening.

4

System Comparison

Shingles, components, warranties, thermal effects and interfaces.

5

Proposal and Phasing

Scope, protection, unit prices, schedule and communication.

6

Samples and Approvals

Physical colors, boards, architects, manufacturers and permits.

7

Tear-Off and Deck Work

Removal, dry-in, wood, deck attachment and documentation.

8

Roof-System Installation

Water-control layers, shingles, details, ventilation and inspections.

9

Quality Control

Field supervision, photos, cleanup, punch and correction.

10

Closeout and Roof File

Inspections, warranties, approvals, repair stock and maintenance plan.

South Florida Service Area

Commercial Shingle Replacement Across Palm Beach and Broward Counties

Palm Beach County

Boca Raton, Delray Beach, Boynton Beach, Lake Worth Beach, Wellington, West Palm Beach, Palm Beach, North Palm Beach, Palm Beach Gardens, Jupiter, Riviera Beach, Royal Palm Beach and surrounding communities.

Broward County

Deerfield Beach, Pompano Beach, Fort Lauderdale, Coconut Creek, Coral Springs, Parkland, Margate, Tamarac, Davie, Weston, Plantation, Pembroke Pines, Hollywood, Miramar and surrounding communities.

Direct Answers

Commercial Shingle Roof Replacement FAQs

What is a commercial shingle roof replacement?

It is a permitted replacement of the complete steep-slope roof assembly for a commercial, association, multifamily, institutional or group-owned property. The scope should address removal, deck condition, secondary water resistance, underlayment, starter, field shingles, hip and ridge, flashing, ventilation, mixed-roof transitions, pressure-zone fastening, inspections, documentation and warranty terms.

Are asphalt shingles appropriate for commercial buildings?

They can be appropriate on commercial buildings with steep-slope roof areas when slope, building height, exposure, deck, fire classification, product approval, attachment and maintenance objectives support the selected assembly. Flat or low-slope areas require a different roof system.

Can shingles be installed on a high-rise building?

High-rise and taller-building applications require careful product-approval and engineering review. In Florida’s High-Velocity Hurricane Zone, asphalt shingles are generally limited to a 33-foot mean roof height unless the specific product approval expressly permits otherwise.

How many nails should be used per shingle in South Florida?

The fastening pattern must follow the current product approval, manufacturer instructions and applicable code. In the HVHZ, RAS 115 requires no fewer than six approved nails per shingle and places additional requirements on nail type, penetration and perimeter detailing.

What is the difference between a shingle product and a complete shingle system?

The field shingle is only one component. A complete system may include deck attachment, seam tape or another secondary-water-resistance approach, underlayment, leak barrier, starter, field shingles, hip and ridge, ventilation, flashing, drip edge and accessory products required by the approved assembly or warranty.

Can a commercial shingle roof be installed over an existing roof?

Recovery is not automatically acceptable. Existing layers, moisture, deck condition, slope, fire classification, fastening, product approval and jurisdictional rules must be reviewed. In the HVHZ, asphalt shingles cannot be recovered over wood shingles, shakes, slate, tile or metal shingles.

How do field, perimeter and corner zones affect a shingle roof?

Wind uplift is often more demanding at roof edges and corners. The approved system may require different fastening, adhesive, starter, perimeter or deck-attachment details by zone. A single generic nailing pattern should not be assumed for every building.

What is secondary water resistance?

Secondary water resistance is a qualifying water-control layer beneath the roof covering intended to reduce water intrusion if the shingles are damaged or displaced. Seam tape, self-adhered deck membrane and other configurations are not automatically equivalent; the exact assembly and documentation control.

Why does roof-deck condition matter?

Shingles require a solidly sheathed, nailable deck. Rotten wood, loose sheathing, raised joints, inadequate fastener engagement, prior repairs and concealed moisture can change the scope, cost and approved fastening performance.

Can changing from tile to shingles affect energy performance?

Yes. Tile may provide thermal mass and an air space beneath the covering. A direct-to-deck shingle assembly may transfer heat differently. Color, reflectance, attic ventilation, insulation, radiant control and duct location should be evaluated rather than assuming the new roof will perform the same.

How should mixed shingle and flat-roof buildings be handled?

The shingle and low-slope systems should be designed together at transitions, walls, valleys, saddles, drains, scuppers, curbs and rooftop equipment. The proposal should identify which contractor and manufacturer control each interface.

How should a condominium or multifamily project manage shingle color variation?

Large projects should approve physical samples, define blend expectations, control manufacturing lots where practical, document substitutions and retain labeled repair stock. Computer screens and small sample boards may not show full-roof color variation.

Do impact-resistant shingles guarantee insurance savings?

No. A laboratory impact classification is not a promise that the roof is hail-proof, and an insurance carrier decides whether a specific product, documentation and policy qualify for a credit. Aastro cannot guarantee a premium reduction or underwriting result.

What warranty applies to a group-owned or commercial shingle roof?

Warranty terms differ from single-family residential terms. Some manufacturers publish separate group-owned or commercial limited warranties. The exact product, components, contractor credential, registration, owner type, maintenance and written warranty control.

What should be included in a commercial shingle proposal?

The proposal should identify the exact shingle and accessories, deck and wood procedure, underlayment and secondary water resistance, starter, ridge, ventilation, fastening, flashing, mixed-roof transitions, phasing, protection, permits, inspections, cleanup, unit prices, exclusions and warranty pathway.

How does Aastro decide between repair and replacement?

Aastro evaluates leak history, age, material brittleness, matching availability, deck and moisture condition, storm evidence, repeated repairs, roof geometry, insurance documentation, ownership horizon and the condition of the complete roof assembly.

Why can two commercial shingle proposals using the same manufacturer still be different?

A manufacturer name does not define the complete commercial shingle assembly. Proposals can differ in the exact shingle family, starter, ridge, secondary water resistance, underlayment, ventilation, deck work, fastening by roof zone, flashings, mixed-roof transitions, color-lot controls, allowances, warranty pathway and closeout documentation. Compare the complete written assembly and scope, not the brand name alone.

What should happen where commercial shingles meet a low-slope roof?

The transition should be designed as one coordinated roof interface. The scope should identify membrane height and termination, drainage, flashing sequence, substrate and deck conditions, trade responsibility, compatible materials, manufacturer requirements and which party owns the warranty at the transition. A shingle proposal should not treat the low-slope area as an unrelated afterthought.

Project Verification Gate

Re-verify the commercial shingle package before permitting, ordering and installation.

Technical content is planning guidance. The final production specification must be reconciled against the exact building, current code, approvals, manufacturer documents and contract.

Product: exact shingle family, plant/color, starter, ridge, underlayment, SWR and accessories.
Wind: mean roof height, pressure zones, product approval/NOA, fastening and substrate.
Building: deck, attic/plenum, ventilation, mixed-roof interfaces, equipment and drainage.
Operations: phasing, occupants, access, weather plan, material lots, repair stock and cleanup.
Commercial terms: concealed work, unit prices, alternates, warranty, ownership and maintenance.
Closeout: permits, inspections, photos, approvals, warranty registration and building-by-building files.
Plan the Complete Assembly

Commercial Shingle Replacement Should Begin with the Building—not the Color Board

Schedule a documented roof investigation before selecting the final product, attachment, phasing or warranty path.